Project Progress

JEET pipeline: site work under way

Work areas lime-stabilized and graded, line pipe strung along the route, and prefabricated tie-in spools delivered to site.

Site work on the JEET Houston Natural Gas Pipeline Interconnection is under way. The work areas have been lime-stabilized and graded, line pipe has been delivered and strung along the route, and prefabricated flanged spools for the tie-ins have arrived on site.

Progress on site

  • Lime slurry applied and mixed into the subgrade for soil stabilization
  • Stabilized subgrade mixed and graded
  • Line pipe staged and strung on supports along the right-of-way
  • Prefabricated flanged spools delivered for the tie-ins
Reclaimer mixing lime into the subgradeStabilized subgrade mixing and gradingLine pipe strung on supports along the pipeline right-of-wayPrefabricated flanged spools delivered to site

The project is an EPC turnkey contract covering installation, tie-in interconnection and extension of more than 3,000 feet of industrial natural gas pipeline, on a planned 45-day schedule.